Inspection and repairs
The cycle of a weld after it is made: request, result, issue, repair, retest. Each record points at the weld and at the record it follows, so the history can be read from start to end.
The easy way: start from the weld
Open the weld. The button under Linked results, issues and repair cycles names what comes next, and the form opens with the weld already chosen and a number suggested. The previous record is chosen for you only where one fits; if several do, choose it yourself. The button on a record's own page follows that record.
The steps
- Request an inspection: what should be inspected, by what method and when. No source file is needed.
- Record a result: what the report says. Needs the report as an uploaded file, the date it was done and where in the file it says so.
- Raise an issue: a defect, hold or non-conformance.
- Record a repair: what was done about the issue.
- Record a retest: the inspection after the repair. If it reports a rejection the cycle goes round again.
The tabs on the page list each kind for the whole project.
Filling in the form
The fields marked with a star are needed. More details holds everything else a report may state, such as edition, provider, coverage and locations. Copy values as the source writes them. Part of the weld covered is yours to fill in: it says what this record covers.
A first entry needs no reason. A correction or a withdrawal does.
Original source-declared result records what the report says, for example Source reports rejection.
Evidence comes first
For anything but a request, upload the document under source files and wait for Scan passed. Then find it in the form.
What this does not do
Weld Intra records what your people and your reports say. It does not interpret NDT results or accept a weld, and a record here is not a release.
Correcting
Create a corrected revision keeps the old version. Withdrawing needs a reason.
NDT companies on NDT Intact
Requests can also go straight to an NDT company, see NDT requests.